The primary function of the Porquerolles Island project is to allow an increase in the station’s wastewater treatment capacity, which inevitably leads to larger sizing of the new buildings. Here, the challenge is to integrate these new buildings as well as possible into the natural terrain, while modifying the relief and vegetation as little as possible.